Pour on site Weighbridge for pit mounting VS210CS
Pour on site Weighbridge for pit mounting enabling installation without the need for a crane on site.
Composite concrete and steel construction. The concrete foundation base together with the weighbridge steel frame act as a shuttering frame for the site-cast reinforced concrete deck to create an extremely strong one-piece sealed platform structure.
Long-lasting and robust yet cost-effective.
All load cells are enclosed in flexible conduits to protect against accidental or vermin damage.
Access to the loadcells and buffering mechanism is from the surface via removable heavy-duty cover plates enabling maintenance works to be carried out in accordance with Health & Safety directives.
Sizes range from 9m to 24m in length with a standard deck width of 3m.